Activating a Site
When you create an NC sequence, the parameters of the active site will be the default parameters. The system will look for an NC sequence specific active site first (for example, Milling), then for a generic active site. If neither is found, the system default parameters will be used.
* 
When you activate an operation, the site(s) associated with the operation’s workcell are activated automatically.
Was this helpful?