坐标测量机 (CMM)
>
Verify Steps
>
The CMM VERIFY Dialog Box
> To Specify Datums
To Specify Datums
The datum is the measured or constructed entity that the dimension or gtol is based upon. By default, the system will use the Ref Csys associated with the Verify step. You can also manually select a different datum entity.
相关主题
About the CMM VERIFY dialog box
这对您有帮助吗?
此站点在 JavaScript 启用时工作最佳