Merge Requirements
You can merge steps manually or automatically. The following are the requirements for manual and automatic merge groups:
Manual Merge Group
• The steps must be consecutive, that is, they must follow each other in the Process view. Reorder the steps if necessary.
• The steps must belong to the same operation.
• The steps must use the same tool.
• The steps must be completely defined.
Automatic Merge Group
• The steps must be consecutive, that is, they must follow each other in the Process view. Reorder the steps if necessary.
• The steps must use the same manufacturing criteria name.
• The steps must use the same Mfg template.
• The steps must use the same tool.
• The steps must have the same orientation.
• The steps must be completely defined.