좌표측정기(CMM)
>
Verify Steps
>
The CMM VERIFY Dialog Box
> To Specify Datums
To Specify Datums
The datum is the measured or constructed entity that the dimension or gtol is based upon. By default, the system will use the Ref Csys associated with the Verify step. You can also manually select a different datum entity.
관련 항목
About the CMM VERIFY dialog box
도움이 되셨나요?
이 사이트는 JavaScript를 사용할 때 가장 잘 작동합니다.