2. Uncheck the power_box part in the Structure Browser as it is not currently needed.
3. Set the harness active:
◦ Click Cabling and then, in the Harness group, click Select. The Set Active Harness dialog box opens.
◦ Double-click Harness_1 in the structure browser.
◦ Click OK to complete the operation.
View the back of the plug and note the two cables have been split into their three-wire representations. You will move these wires to their correct locations. Also note the pre-existing terminals connected to the ground screw and the bottom set of screws: