Bridge wireframe segments
The Bridge command inserts a spline curve between two non-contiguous segments of a channel or cable.
To bridge segments,
1. Click Cabling and then, in the Modify group, click the arrow next to More.
2. Click
Bridge. The
Bridge Curve dialog box opens.
3. Select the first segment to bridge. If necessary, adjust the tangent length in the TangLen box.
4. Select the second segment to bridge. If necessary, adjust the tangent length in the TangLen box.
| Connecting to the wrong end? Where you click the edge matters. This command takes the closest end to the selection point. |
5. Click
Next to bridge other segments, or Click
to complete the operation.