Arbortext PE 子流程 Pool Work Thread
Each Arbortext PE 子流程 pool starts a background work thread that runs periodically and attempts to perform routine maintenance. The interval between runs is configured in the workThreadInterval attribute of each SubprocessPool element in e3config.xml. The default is every 5 seconds. Each time it runs, a work thread checks for the following items. Descriptions of each item follows.
unusable Arbortext PE 子流程
Arbortext PE 子流程 that should be terminated
Arbortext PE 子流程 that have exceeded the allowed idle or lifetime period
deferred requests to delete directories
whether a new Arbortext PE 子流程 should be started
這是否有幫助?