Starting New Arbortext PE 하위 프로세스
A new Arbortext PE 하위 프로세스 can be started when the request load increases and there are fewer than the configured maximum number running. In addition, the pool work thread checks whether the configured minimum number of Arbortext PE 하위 프로세스 are running. If fewer than the minimum number are running, the work thread starts another Arbortext PE 하위 프로세스.
Parent topic