Starting New Arbortext PE サブプロセス
A new Arbortext PE サブプロセス can be started when the request load increases and there are fewer than the configured maximum number running. In addition, the pool work thread checks whether the configured minimum number of Arbortext PE サブプロセス are running. If fewer than the minimum number are running, the work thread starts another Arbortext PE サブプロセス.
これは役に立ちましたか?