Detecting Hung Arbortext PE サブプロセス
Each time the
Arbortext PE Request Manager makes a call to an
Arbortext PE サブプロセス, the pool records the time. The work thread checks every busy
Arbortext PE サブプロセス in its pool to see whether the time elapsed from the start of the operation has exceeded the configured
maxBusyInterval attribute value (explained in
The maxBusyInterval Attribute). If it has, the work thread sets a flag. Later, the work thread notifies the operating system to terminate these flagged
Arbortext PE サブプロセス. As a result, the
Arbortext PE Request Manager request thread waiting for a response from an unusable
Arbortext PE サブプロセス receives an error.
Detecting unusable Arbortext PE サブプロセス avoids Arbortext PE サブプロセス software malfunctions that can:
• permanently consume Arbortext PE Request Manager capacity (infinite loops, indefinite waits)
• result in no response being returned to a waiting client
However, it is possible that an Arbortext PE サブプロセス can't respond before the maxBusyInterval elapses, because it is processing a request that takes a long time. During your site setup, evaluate the requests likely to be submitted, and set the maxBusyInterval to a value that will allow lengthy jobs to complete.
Parent topic