Allocation Types
The following allocation types are available:
Consumed -- A part that is assembled during an operation.
Produced -- A part that has been accounted for by other operations in the same or other process plans. For example, if the cutting of one part during the course of an operation, produces a second, usable part.
Disassembled -- A part that needs some assembly, before it can be used in the operation.
Destroyed -- A part that is destroyed during the processing of the operation.
* 
Selected parts are added to the BOM of the part associated with the process plan and at the same time the newly created occurrences are allocated to the operation.
Was this helpful?