Checking In an Object
After you
check out an object you can save any changes you make to the object, by checking the object back in.
To check in an object, use the following procedure:
1. From the structure pane select the working copy of the object.
2. To check in,
◦ Select > .
or
◦ Click the check in icon
.
or
◦ Right-click on your mouse, and select Check In.
The Check In window opens.
3. Enter comments, if desired, and click OK.
If the check-in operation is successful, the working copy is replaced with the checked-in copy.
| The check in and check out behavior of objects in a structure can be modified using the Preference Management utility, under the PSE node. For example, to prevent the automatic check in of all operations and sequences belonging to a process plan when the process plan is checked in, set the Automatic Check In Operations and Sequences preference to No. |