Examining Existing Revaulting Schedules
Before creating, modifying, or deleting existing revaulting operations, you may want to examine the existing schedules. You can do this on the External Storage Scheduling window. This window displays a list of vaults for which revaulting has been scheduled, along with the frequency, time of the next revaulting process, and status of the current revaulting run. A status of Ready means that the run has been scheduled.
For information about accessing the
External Storage Scheduling window, see
Scheduling External Storage.