Integration with Other Applications > Integration with Production Systems > Integrating Windchill ESI With Oracle Applications > Process Plans > Operation Allocated Parts
  
Operation Allocated Parts
When you associate various attributes to the operation allocated parts in a process plan in Windchill MPMLink, Windchill ESI passes the operation allocated parts attributes to the EAI software components. The following attributes are passed:
Part Number (this is the number of the component part in the assembly that is associated to the process plan)
Operation Number in Operation Allocated Part Link
Operation Label in Operation
Assembly Part Number
BOM Usage
BOM Alternate
Quantity
Quantity Unit
Once the operation allocated parts data has been published by Windchill ESI Services, the EAI software components map the Windchill operation allocated parts attributes to Oracle Manufacturing table attributes. The following table shows the mapping of Windchill operation allocated parts attributes to Oracle Manufacturing attributes:
Windchill Operation Allocated Part Attributes
Oracle Manufacturing Attribute
Assembly Part Number
Bills Of Material that needs to be created/changed for assigning the operation sequence number to its component.
Component Part Number
Component Number to which the operation sequence is applied.
Operation label of associated Operation number
Allocated Component’s Operation Sequence Number