Get Production Order Components
A production order defines which material is to be processed, at which location, and at what time, and how much quantity is required. It also defines which components and sequence of operations are used and how the order costs are settled.
Use this action to get the general data, its components, and operation details for a production order.
The following BAPI has been used for this action:
Using the Get Production Order Components Action
To use this action in your workflow, connect it to ThingWorx Flow. To create a flow, do the following:
1. Drag the Get Production Order Components action under the SAP connector to the canvas, place the pointer on the action, and then click or double-click the action. The Get Production Order Components action window opens.
2. Edit the label name, if needed. By default, the label name is same as the action name.
3. To add a connection, refer to the section Adding a SAP Connection in the SAP connector topic.
4. In the Production Order field, enter a production order id to fetch the production order components.
5. Click Done.
Output Schema
The Get Production Order Components action returns a static output schema. See a sample output schema in the figure that follows:
Was this helpful?