User Help > Grouping Units of Work in Change Packages > Reviewing Change Packages > Accepting a Change Package
 
Accepting a Change Package
CLI EQUIVALENT 
si acceptcp
After a change package is submitted, each individual reviewer and one member of each reviewer group (if specified) in the reviewer list must accept the change package before it can be committed to the repository and then closed. To see a list of reviewers for a change package, view the change package review log.
* 
To accept a change package, the Integrity Lifecycle Manager client must be connected to the server on which the change package resides.
To accept a change package in the GUI and Web interface