|
If the diagram has only one sheet, Diagram creates a second sheet and places the items on the new sheet after you click Move to Sheet.
|
|
All wires attached to the symbol nodes break at an arbitrary point on the first sheet and continue on the destination sheet, with break-off points displayed as "X". You can later modify the wire shape and the break-off point location.
|